It is ddin part of the standard that regulates the installation of surface-embedded radiant systems. For at least 3 days the screed must be protected from drying too quickly. It must be covered on top by a protective layer which can be a polyethylene sheet of thickness equal to at least 0.

BS EN 1264-4:2009

Walls and ceilings must be able to support the radiant system. Learn more about the cookies we use and how to change your settings.

Determination of the thermal output BS EN The absence of leaks must be documented in a test report which must also include details of the pressure at which the test was performed. This means that, whatever the procedures and choices made before the radiant surface is laid, that established in UNI EN must be complied with, without exception, when installing the radiant system.

This website is best viewed with browser version of up to Microsoft Internet Explorer 8 or Firefox 3. Tubing must be attached using a secure anchoring system that ensures the tubing does not move more than 5 mm vertically and more than 10 mm horizontally from the position where it was installed.

The tubing used for the radiant floor ej must have an oxygen barrier and meet the technical specifications of reference standards. Let us help you with your project. These devices must also work in the absence of an electric current. The perimeter strip and protective insulation layer must be positioned in such a way sin the screed does not seep along the perimeter under the insulation.

  AMPUTACION SUPRACONDILEA PDF

Standard UNI EN 1264

Search all products by. The faster, easier way to work with standards. Please download Chrome or Firefox or view our browser tips. During transport and storage on site, tubing must be protected from external damage and direct sunlight.

Accept and continue Learn more about the cookies we use and how to change your settings. Click to learn more. We use cookies to make our website easier to use and to better understand your needs. Take the smart route to manage medical device compliance. Customers who bought this product also bought BS EN If superficial cuts are made to the screed, these must not have a depth greater than a third of the thickness of the screed. Perimeter strips must also be left around all the structural components of the building that penetrate the screed e.

I want to be contacted.

BS EN – Water based surface embedded heating and cooling systems. Installation

Guide to radiant comfort Efficient design Wn cooling Regulation Norms. The thickness of the tubing must be such as to meet Class 4 requirements according to ISOresistant to a working pressure of 4 bar and expected lifetime of 50 years. You may find similar items within these categories by selecting from the choices below:. It defines the conditions that must be present at the time of laying the radiant floor system: Before laying the screed onto the coils, a pressure of no less than 4 bar and no greater than 6 bar must be applied to make sure there are no leaks.

  AASHTO M320 PDF

There must be no areas of irregular shape. Tubing must be laid at least 50 mm from the perimeter and mm from any possible cause of damage to the tubing e. The flooring contractor must check that the chosen floor finish is compatible with the conditions. Find Similar Items This product falls into the following categories. Joints must be positioned by all the doors. The radiant floor must be laid leaving a perimeter strip along all the walls that delimit the area to be 126-4.

It details the minimum material requirements to be used with a radiant surface system and the requirements that have to be met for successful installation. In relation to the screed, UNI EN recommends that its thickness is no less than that stipulated em the regulations specifying screed load capacity and dim strength class.

The standard describes the installation of the radiant surface, distinguishing between radiant floors, walls and ceilings.

Joints must be positioned – and be of dib number – to delimit areas not exceeding 40 m2 and no longer than 8 m. The distribution manifold must be positioned in such a way as to minimise the length of supply tubing required. Prove methods for the determination of the thermal output using calculation and test methods. Extreme care must be taken when laying the screed so as not to damage any of the components of the radiant floor.